Thane Coastal Road

Thane Coastal Road (Balkum to Gaimukh): Impact on Kolshet, Balkum and Ghodbunder Commercial Property

Quick answer: The Thane Coastal Road is a 13.45 km, six-lane MMRDA corridor from Kharegaon (Balkum) on the Mumbai–Nashik highway to Gaimukh on Ghodbunder Road, running along Thane Creek. With a cost of about ₹2,727 crore and completion targeted for December 2028, it will take heavy traffic off Ghodbunder Road and improve access to Balkum, Kolshet, Kasarvadavali and Gaimukh, the micro-markets that stand to gain most.

Ghodbunder Road carries city traffic, heavy vehicles heading to Gujarat and the western suburbs, and local trips, all on one road. The Thane Coastal Road is designed to split that load by creating a parallel route along the creek.

For commercial property owners and tenants, the road matters because it changes which locations are easy to reach by vehicle, which is still how most clients, deliveries and many employees travel.

Key takeaways

  • Route: Kharegaon toll naka (Balkum) to Gaimukh, about 13.45 km, six lanes, access-controlled.
  • Agency and cost: MMRDA, about ₹2,727 crore.
  • Progress: viaduct foundation work crossed 50% in February 2026; completion is targeted for December 2028.
  • At Gaimukh it is planned to connect with the Gaimukh–Fountain Hotel tunnel towards Bhayander.
  • Biggest beneficiaries: Balkum, Kolshet, Kasarvadavali, Owale and Gaimukh, especially for showrooms, logistics-linked offices and large-floorplate users.

Thane Coastal Road at a glance

Parameter Detail
Start Kharegaon / Balkum, on the Mumbai–Nashik highway (old NH-3)
End Gaimukh, on Ghodbunder Road
Length About 13.45 km
Lanes 6, access-controlled, partly elevated
Cost About ₹2,727 crore
Target December 2028
Agency MMRDA

Because the road runs along Thane Creek, parts of it pass through mangrove and coastal regulation zones. Environmental conditions have shaped the design, and any plot near the alignment can still face coastal regulation (CRZ) limits after the road is built.

Which commercial locations gain the most?

Balkum and Kharegaon

Balkum sits at the southern start of the road and close to the Mumbai–Nashik highway. It is well placed for showrooms, service centres and offices that depend on vehicle access. New mixed-use projects on Old Agra Road already reflect this.

Kolshet Road

Kolshet sits between the creek and Ghodbunder Road. A coastal road interchange plus the Ring Metro station at Kolshet Industrial Area gives it two major access upgrades. See our area-by-area rent guide for current Kolshet numbers.

Kasarvadavali, Owale and Gaimukh

These northern pockets are where Ghodbunder congestion hurts most. A faster creek-side route and the Metro Line 4A terminus at Gaimukh together make the upper corridor far more practical for commercial use.

What the road does not solve

The coastal road is a vehicle corridor. It will not help staff without cars unless public transport uses it. For daily commuting, the metro lines matter more. It also does not connect directly to the Mumbai Coastal Road; the Phase 1 road ends at Gaimukh.

A second phase, a Thane Coastal Road from Gaimukh towards Bhayander and from Kharegaon towards Anand Nagar, is still being planned. Do not price that into a purchase yet.

How investors and occupiers should respond

  1. Shortlist projects near interchanges, not just near the alignment. A plot beside an elevated road with no exit gains little.
  2. Check CRZ and forest clearances for any land or project close to the creek.
  3. For showrooms and service businesses, compare frontage, parking and loading access, not just rent per sq ft.
  4. Combine the road with metro access for office use. Locations with both will lease best.

Our guide to upcoming national highways shows how road projects have changed commercial demand elsewhere in India.

Frequently asked questions

When will the Thane Coastal Road be completed?

MMRDA is targeting December 2028. Foundation work for the viaduct crossed the halfway mark in February 2026.

What is the route of the Thane Coastal Road?

It runs about 13.45 km from Kharegaon toll naka at Balkum on the Mumbai–Nashik highway to Gaimukh on Ghodbunder Road, along Thane Creek.

Will the coastal road reduce traffic on Ghodbunder Road?

It is designed to divert through and heavy traffic away from Ghodbunder Road, which should ease congestion, especially near Kasarvadavali and Gaimukh.

Which areas benefit from the Thane Coastal Road?

Balkum, Kolshet, Kasarvadavali, Owale and Gaimukh sit along or near the alignment and stand to gain most.

Does the Thane Coastal Road connect to the Mumbai Coastal Road?

No. Phase 1 ends at Gaimukh. A link towards Bhayander via the Gaimukh–Fountain Hotel tunnel is planned separately.

Next step

Looking for office space, a pre-leased asset or a shop in Thane? The Office Space in Thane team tracks new launches, resale and lease options across Wagle Estate, Ghodbunder Road, Kolshet, Majiwada and Pokhran Road. Share your budget, size and preferred micro-market through the enquiry form on officespaceinthane.in and we will send you a verified shortlist.

Last updated: November 2026. Prices, rents, timelines and tax rules change often; figures here are indicative. Check the latest MahaRERA records and project documents, and speak to a chartered accountant or property lawyer before you commit.

Call Now Button